Large data center campuses keep equipment on site for months. On-site lubrication stations, labeled fluids, and scheduled oil sampling help keep machines working.
Keep fluids clean on site
Dust and mud are constant on large earthwork jobs. Sealed containers and clean transfer equipment protect hydraulic systems.
ONE-PAGE FIELD GUIDE · PDF
Where a data center uses lubricants
A one-page site map of every place a data center uses oil, fuel care, coolant or grease, with what to check and which AMSOIL products to compare against the specification. Print it, post it in the shop, or pass it along.
Shop AMSOIL directly with Jeff’s dealer number already attached, or open a business account. AMSOIL handles pricing, checkout, and shipping. If you contact AMSOIL another way, give them dealer number 30734402.
Prefer to talk it through? Email Jeff at [email protected] with your equipment, the fluid now in use, and your approximate volume.
Frequently asked questions
Do construction generators need different oil?
They need the oil their engine maker specifies; job-site use often counts as severe duty.
Can a contractor open an AMSOIL commercial account?
Yes, contractors can apply for an AMSOIL commercial account. AMSOIL sets eligibility and terms.
General maintenance information. Always follow your equipment manufacturer’s requirements and the current product data. Product availability, pricing, and account terms are set by AMSOIL.